Laundry Room Progress and Our First Tile Job

The last couple of weekends have been a race to get the laundry room finished.

Just so you have an idea of what we were working with, here’s a before pic:

I know, it’s extremely icky.  The hallway led into the master bedroom, and on the left was the laundry closet with broken louver doors, LOTS of dirt and grime, broken vinyl tiles, and “popcorn” texture ceiling.

After scraping the ceilings, removing the tile, and taking out the closet frame, we decided to close off the doorway to the master bedroom and enlarge the laundry closet to make a laundry ROOM.

The master bedroom is also being enlarged and there will be a different entrance to it, so we didn’t need the current doorway.  Also, removing the doorway allows us to enlarge the master bath.

This meant that Chris and his dad (aka Jamie, our secret weapon) spent the last couple of weekends rerouting the plumbing, moving the water heater, putting in faucets for the washer/dryer and laundry room sink, as well as new drains.  They also had to move the attic trapdoor so that it would be right in the center of the laundry room (instead of half in the master bedroom).  They framed in the new attic trapdoor as well as a new “plumbing” wall.

Chris got to work with a blowtorch, which was fun and very manly/sexy.

After the plumbing was done and the new wall framed, it still wasn’t looking pretty, but you could definitely visualize the new laundry “room”.

We got right to work tiling the concrete floor.

We thought the laundry room would be a good place for us to do our first tiling job, since if we mess up, at least it’s not a room a lot of guests will see.  Even as novice tilers, though, we found that tiling wasn’t very difficult.  Of course, having Chris’ dad as a teacher helped a lot.

First Chris and Jamie chalked out a line on the bare concrete floor, that was squared with the walls and would act as a guideline.  Then Chris applied the thinset, scraping it against the concrete floor to ensure that it adhered well.  Then, he evened it out with a notched trowel:

Then he laid the tile up against the already-set tiles.  I handed him a few plastic spacers, and he used the spacers to push the tile out with 1/8″ space for grout.

He pressed the tiles down with a scrap 2×4 to level them all out evenly.

The tiles on the sides of the room had to be cut, so Chris measured them out using another tile as a guide, and marked them with a tile marker.

Chris’ dad already had the tile saw, so Chris got to play with another cool new tool.  I’m happy to say, we did not ruin even one piece of tile!

The tiles along the sides were applied with the same principles as the whole tiles, except with a smaller notched trowel.

Coming up next time, the fully tiled floor and our next project, installing the drywall in the laundry room!  I’m looking forward to the ceiling being finished so cold air doesn’t keep blowing into the house through the attic!  Finishing the laundry room will effectively seal off half of the house from cold air and construction dust/debris from the master bedroom, which is a top priority for us with the baby coming so soon.

6 weeks left till D-day! Oh my.

 